| General Project Documents |
| Date |
Title/Description |
| May 2008 |
Final Report:
Cover
Table of Contents
Executive Summary
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Appendices:
Appendix 1 - Commonly Used Acronyms
Appendix 2 - Traffic Volumes (10 MB)
Appendix 3 - Speed Data
Appendix 4 - Crash Data
Appendix 5 - Travel Time Information
Appendix 6 - Traffic Operations and Queue Lengths:
Queue Summary
Ramp Worksheets 2A 2B 3A 3B
Appendix 7 - Route I-93 Corridor Study Alternatives:
Alternative 1
Alternative 2
Alternative 3
Alternative 4
Alternative 5
Alternative 6
Alternative 7
Appendix 8 - Graphics of Alternatives Developed for Methuen Rotary Study:
C1B
C1C
C2B
C2C
C2D
C3A
C3B
C4A
C4B
C5A
C5B
Appendix 9 - Potential Development in Dracut Memo
Appendix 10 - Breakdown of Construction Costs:
Alternative 2A
Alternative 2B
Alternative 3A
Alternative 3B
Short-Term Alternative Combined
Short-Term Alternative 1
Short-Term Improvement 2 - Striping
Short-Term Alternative 3
Appendix 11 - Study Advisory Committee Members
Appendix 12 - Study Advisory Committee Meeting Minutes:
December 11, 2007
September 25, 2007
July 26, 2007
February 6, 2007
October 24, 2006
March 29, 2006
April 8, 2004
Appendix 13 - Public Information Meeting Minutes:
Novenber 8, 2007
November 9, 2006
Appendix 14 - Public Comments and Responses (5 MB)
|
| March 2008 |
Draft Final Report:
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5 |
| March 2008 |
Project Briefing |
| November 2007 |
Project Briefing |
| October 2007 |
Project Briefing |
| August 2007 |
Project Briefing |
| October 27, 2006 |
Draft Study Report - Task 1 - Project Overview |
| |
Draft Study Report - Task 2 - Existing Conditions and Issues Identification (2.8 MB) |
| |
Draft Study Report - Appendix |
| October 18, 2005 |
Project Team Kick-Off Meeting |
| July 26, 2005 |
Structure of a Transportation Planning Study |
| June 5, 2005 |
Study Scope |
| March 21, 2005 |
Massachusetts Transportation Planning Studies |
| October 5, 2004 |
Standard Process for Transportation Planning Studies |
| |
|
| Public Informational Meetings |
| Date |
Title/Description |
| November 8, 2007 |
Meeting Summary | Powerpoint Presentation (9MB PDF) |
Handouts from Nov. 8
meeting |
NOTE -files listed below may be large - allow time for download |
| |
Map - Alternative 2B (>11MB - JPEG file) |
| |
Map - Alternative 3A (>9MB JPEG file) |
| |
Map - Short Term Alternaitves 1 and 2 (>20MB) |
| |
Map - Transit Options (1.0MB)
|
| November 9, 2006 |
Meeting Summary | Powerpoint Presentation (1.2MB PDF) |
| |
|
| Study Advisory Committee Meetings |
| Date |
Title/Description |
| December 11, 2007 |
Meeting Summary |
| September 25, 2007 |
Meeting Summary | Powerpoint Presentation (7MB PDF) |
| July 26, 2007 |
Meeting Summary | Powerpoint Presentation (4MB PDF) |
| February 6, 2007 |
Meeting Summary | Powerpoint Presentation (3MB PDF) |
| October 24, 2006 |
Meeting Summary | Powerpoint Presentation (1.5MB PDF) |
| March 29, 2006 |
Meeting Summary | Powerpoint Presentation (2MB PDF) |
| April 8, 2004 |
Meeting Summary |
| |
|
| Plan and Studies |
| Date |
Title/Description |
| October 2005 |
I-93 Corridor Traffic Study (broken into separate chapters due to file size considerations) Cover Table of Contents Executive Summary - ES-1 (1.5 MB file size)
1.0 Introduction - 1-1 (0.8 MB) 2.0 Existing Conditions - 2-1 (24.5 MB) 3.0 2025 No-Build Traffic Conditions - 3-1 (15.3 MB) 4.0 Mainline Improvements - 4-1 5.0 Interchange Improvements - 5-1 (72 MB) 6.0 Intersections Improvements - 6-1 7.0 Rail Improvements - 7-1 (3.5 MB) 8.0 Bus Improvements - 8-1 (2.0 MB) 9.0 Conclusions and Recommendations - 9-1 |
| August 2005 |
Merrimack Valley Metropolitan Planning Organization Fiscal Year 2006-2010 Transportation Improvement Plan |
| September 19, 2003 |
Merrimack Valley Metropolitan Planning Organization 2003 Regional Transportation Plan |
| Other |
| Mass. Highway Dept. EOT |
Type I and Type II Noise Barrier Programs Guidebook
|