Methuen Rotary Study Banner
spacer

Massachusetts Executive Office of Transportation

MassHighway

TranSystems Corp.
Documents
General Project Documents
Date Title/Description
May 2008

Final Report:
Cover
Table of Contents
Executive Summary
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5

Appendices:
Appendix 1 - Commonly Used Acronyms
Appendix 2 - Traffic Volumes (10 MB)
Appendix 3 - Speed Data
Appendix 4 - Crash Data
Appendix 5 - Travel Time Information
Appendix 6 - Traffic Operations and Queue Lengths:

Queue Summary
Ramp Worksheets 2A 2B 3A 3B
Appendix 7 - Route I-93 Corridor Study Alternatives:
Alternative 1
Alternative 2
Alternative 3
Alternative 4
Alternative 5
Alternative 6
Alternative 7
Appendix 8 - Graphics of Alternatives Developed for Methuen Rotary Study:
C1B
C1C
C2B
C2C
C2D
C3A
C3B
C4A
C4B
C5A
C5B
Appendix 9 - Potential Development in Dracut Memo
Appendix 10 - Breakdown of Construction Costs:

Alternative 2A
Alternative 2B
Alternative 3A
Alternative 3B
Short-Term Alternative Combined
Short-Term Alternative 1
Short-Term Improvement 2 - Striping
Short-Term Alternative 3
Appendix 11 - Study Advisory Committee Members
Appendix 12 - Study Advisory Committee Meeting Minutes:

December 11, 2007
September 25, 2007
July 26, 2007
February 6, 2007
October 24, 2006
March 29, 2006
April 8, 2004
Appendix 13 - Public Information Meeting Minutes:
Novenber 8, 2007
November 9, 2006
Appendix 14 - Public Comments and Responses (5 MB)

March 2008 Draft Final Report:
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
March 2008 Project Briefing
November 2007 Project Briefing
October 2007 Project Briefing
August 2007 Project Briefing
October 27, 2006 Draft Study Report - Task 1 - Project Overview
  Draft Study Report - Task 2 - Existing Conditions and Issues Identification (2.8 MB)
  Draft Study Report - Appendix
October 18, 2005 Project Team Kick-Off Meeting
July 26, 2005 Structure of a Transportation Planning Study
June 5, 2005 Study Scope
March 21, 2005 Massachusetts Transportation Planning Studies
October 5, 2004 Standard Process for Transportation Planning Studies
   
Public Informational Meetings
Date Title/Description
November 8, 2007 Meeting Summary | Powerpoint Presentation (9MB PDF)
Handouts from Nov. 8
meeting
NOTE -files listed below may be large - allow time for download
  Map - Alternative 2B (>11MB - JPEG file)
  Map - Alternative 3A (>9MB JPEG file)
  Map - Short Term Alternaitves 1 and 2 (>20MB)
  Map - Transit Options (1.0MB)
November 9, 2006 Meeting Summary | Powerpoint Presentation (1.2MB PDF)
   
Study Advisory Committee Meetings
Date Title/Description
December 11, 2007 Meeting Summary
September 25, 2007 Meeting Summary | Powerpoint Presentation (7MB PDF)
July 26, 2007 Meeting Summary | Powerpoint Presentation (4MB PDF)
February 6, 2007 Meeting Summary | Powerpoint Presentation (3MB PDF)
October 24, 2006 Meeting Summary | Powerpoint Presentation (1.5MB PDF)
March 29, 2006 Meeting Summary | Powerpoint Presentation (2MB PDF)
April 8, 2004 Meeting Summary
   
Plan and Studies
Date Title/Description
October 2005 I-93 Corridor Traffic Study (broken into separate chapters due to file size considerations)
Cover
Table of Contents
Executive Summary - ES-1 (1.5 MB file size)
1.0 Introduction - 1-1 (0.8 MB)
2.0 Existing Conditions - 2-1 (24.5 MB)
3.0 2025 No-Build Traffic Conditions - 3-1 (15.3 MB)
4.0 Mainline Improvements - 4-1
5.0 Interchange Improvements - 5-1 (72 MB)
6.0 Intersections Improvements - 6-1
7.0 Rail Improvements - 7-1 (3.5 MB)
8.0 Bus Improvements - 8-1 (2.0 MB)
9.0 Conclusions and Recommendations - 9-1
August 2005 Merrimack Valley Metropolitan Planning Organization Fiscal Year 2006-2010 Transportation Improvement Plan
September 19, 2003 Merrimack Valley Metropolitan Planning Organization 2003 Regional Transportation Plan
Other
Mass. Highway Dept. EOT Type I and Type II Noise Barrier Programs Guidebook